|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
Not Just Another
Day In Your Backyard
Swimming Pool Installation
|
|
|
|
|
|
|
| 9 am*: After
the Swimming Pool Site has been excavated and leveled, construction of the
bottom and top channels can begin. |
|
|
|
|
|
|
|
|
|
|
| 10 am*: Then
beach sand is put into place on the inside of the Swimming Pool area.
This protects the virgin liner and creates a comfortable base for
you to walk on. |
|
|
|
|
|
|
|
|
|
|
| 11 am*: The
Massive supporting Aluminum Decks are assembled. |
|
|
|
| Ambassador
Pools in no form or manner collects any personal data from this
site. 2006 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 pm*: The Swimming Pool walls and safety fence are assembled. |
|
|
|
|
|
|
|
|
|
|
| 5 pm*: With
the heavy virgin liner laid tightly in place, the final plumbing
hookups are completed and the pool fills. |
|
|
|
|
|
|
|
|
|
|
| Tomorrow the kids go
Swimming! |
|
|
|
|
|
|
|
|
|
|
|
|
| ©2005-2006
Ambassador Pools Inc. All Rights Reserved |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|