Not Just Another Day In Your Backyard
Swimming Pool Installation


9 am*: After the Swimming Pool Site has been excavated and leveled, construction of the bottom and top channels can begin.
10 am*: Then beach sand is put into place on the inside of the Swimming Pool area. This protects the virgin liner and creates a comfortable base for you to walk on.
11 am*: The Massive supporting Aluminum Decks are assembled.
Ambassador Pools in no form or manner collects any personal data from this site. 2006
3 pm*: The Swimming Pool walls and safety fence are assembled.
5 pm*: With the heavy virgin liner laid tightly in place, the final plumbing hookups are completed and the pool fills.
Tomorrow the kids go Swimming!

* The time table indicated above is an example of a 1 day Swimming Pool Installation however; each backyard is different and may require more time to complete Swimming Pool Installation depending on the yard and weather.